A cleanroom is one kind of controlled environment. The same engineering, the same compliance discipline and the same trades build containment laboratories, analytical labs, temperature controlled rooms and high care food areas. We build all of them.
Any room where the air, the temperature, the pressure, the particulate count or the containment has to be engineered deliberately, then proven to a third party before the room can be used.
That definition covers a lot more than cleanrooms. It covers the PC2 laboratory a university needs recertified. It covers the stability room a manufacturer has to prove holds 25 degrees and 60 percent relative humidity for twelve months. It covers the cytotoxic suite a pharmacy has to get past a board inspection, and the high care zone a food manufacturer has to get past a customer audit.
They are different rooms with different regulators. The thing they have in common is the part most builders get wrong: the room is not finished when it looks finished. It is finished when somebody independent tests it and signs.
A builder who has only ever handed over a room at practical completion has never been tested by the part that matters. We build to the handover that comes after the handover.
New containment labs and PC2 to PC3 uplifts for universities, research institutes, diagnostics and veterinary laboratories, built to AS/NZS 2243.3 and the OGTR certification guidelines.
Read more $100k to $1.5MTesting, pathology, food, environmental and assay laboratories built so the fitout supports NATA accreditation rather than getting in its way.
Read more $20k to $250kStability chambers, cold rooms, warm rooms and cytotoxic storage. Small, fast, and unforgiving if the mapping fails.
Read more $80k to $500kSterile and cytotoxic compounding suites, anterooms and gowning flows built to survive an inspection rather than just look clean.
Read more $100k to $2MHigh care and high risk zones, allergen segregation and hygienic finishes for manufacturers whose customers audit them.
Read more SpecialistGMP radiopharmacy suites, hot cells, cyclotron vaults and shielded structures. A small field with very few builders who have worked in it.
Read moreMost of the specialist firms in this market are fitout and panel businesses. They are good at what they do, and what they do is the inside of the box. They will install your wall and ceiling system and they will do it well.
What they generally cannot take is the rest of it. The slab. The structure. The roof penetrations. The fire separation. The building approval. The certifier. The town planning application when the use changes. The head contractor liability for the whole thing.
And most licensed builders who can take all of that have never read the PIC/S Guide to Good Manufacturing Practice, do not know what a pressure cascade is, and will find out what Annex 1 means for their finishes on the day someone rejects them.
Frampton Cleanrooms sits in the gap. A licensed builder that has delivered GMP compliant rooms, and can take the base build, the structure and the services as one contract with one accountable party.
| Standard | Where it applies |
|---|---|
| ISO 14644 (AS ISO 14644) | Cleanroom classification, testing and monitoring |
| PIC/S Guide to GMP | Medicine manufacture licensed by the TGA |
| GMP Annex 1 | Sterile medicinal product manufacture |
| AS/NZS 2243.3 | Safety in laboratories, microbiological aspects and containment |
| OGTR certification guidelines | Physical containment facilities working with GMOs |
| HACCP | Food and nutraceutical high care and high risk areas |
| National Construction Code | The building itself, including Class 8 facility provisions |
Your certifier, your validation team and your regulator will confirm exactly what applies to your facility. Our job is to have read all of it before we price the work, not after.
Talk it through with a licensed builder who has delivered GMP compliant rooms, before the design is locked. That is the point where the decisions are cheapest to change.