An accredited laboratory is assessed on whether its facilities and environmental conditions let it produce valid results. The building is part of the accreditation, not a backdrop to it.
Commercial testing laboratories, pathology and medical laboratories, food and water testing laboratories, environmental laboratories, mining and minerals assay laboratories, and the research groups whose analytical work has outgrown the bench space it started on.
Most of them hold or want accreditation from NATA, against ISO/IEC 17025 for testing and calibration or ISO 15189 for medical laboratories. Those standards have requirements about facilities and environmental conditions, about separating incompatible activities, and about controlling and monitoring conditions where they affect results.
In other words, the fitout is in scope. An assessor can raise a finding about your building.
Which activities must not happen near each other, and what physical form that separation takes. Sample receipt and preparation away from analysis. Trace work away from anything that could contaminate it. Microbiology away from molecular. This drives the floor plan, and the floor plan drives everything else.
Laboratory fitouts are services projects wearing a building costume. Fume cupboard exhaust, gas reticulation, deionised water, vacuum, data, and enough power in enough places. The cost difference between a well coordinated services design and a poor one is large, and it is decided early.
Where the cupboards go determines where the exhaust risers go, which determines where the roof penetrations go, which is a structural and weatherproofing question. Positioning them late is expensive.
Where temperature or humidity affect the result, they have to be controlled and usually monitored and recorded. That is a mechanical and controls scope with a validation tail.
Chemical resistance appropriate to the actual reagents in use, and a layout that matches the workflow rather than the standard catalogue module.
The cheapest laboratory fitout is the one where the workflow was mapped before the walls were drawn. The most expensive is the one where the benching was ordered before anyone asked how the samples move.
Most laboratory work is a refurbishment inside a building that cannot stop. That makes the construction methodology as important as the design.
None of that is exotic. It is ordinary commercial construction discipline applied by a builder who understands why a vibrating slab matters to a balance room.
Talk it through with a licensed builder who has delivered GMP compliant rooms, before the design is locked. That is the point where the decisions are cheapest to change.