Food manufacturers are audited by their customers, and the audit has been getting harder for years. A high care zone built to pharmaceutical discipline passes those audits comfortably. One built to general commercial standard usually does not.
Food manufacturers running ready to eat or post process products, dairy and beverage processors, nutraceutical and supplement manufacturers, pet food producers, and export registered establishments whose facility has to satisfy an overseas regulator as well as a domestic one.
The common thread is that somebody else decides whether your building is good enough. Sometimes that is a regulator. More often it is a major customer's auditor, arriving with a scheme checklist and a camera.
Because a high care food zone and a GMP cleanroom are the same building problem with different paperwork.
| The requirement | Pharmaceutical | High care food |
|---|---|---|
| Separation of clean from less clean | Classified zones and airlocks | High care and low care segregation |
| Air moving the right direction | Pressure cascade | Positive pressure to high care |
| People change before entering | Gowning sequence | Hygiene entry, boot wash, handwash |
| Cleanable surfaces with no traps | Coved, non shedding finishes | Hygienic finishes, coved, sealed |
| Controlled material flow | Pass throughs and airlocks | Product and waste segregation |
Nobody in this market is offering food manufacturers a builder who works to pharmaceutical discipline. That is the whole proposition.
In our experience the findings are rarely about the big things. They are about the same short list of construction details, over and over.
All construction. All avoidable at the specification stage, and all expensive once the line is running.
Talk it through with a licensed builder who has delivered GMP compliant rooms, before the design is locked. That is the point where the decisions are cheapest to change.