Controlled environments

Controlled temperature and stability rooms

The smallest controlled environment we build, and the one with the least tolerance for a near miss. A stability room that drifts out of specification does not just need fixing. It can invalidate the study that was running inside it.

Home › Controlled environments › Controlled temperature rooms

What these rooms are

Room typeWhat it holds
Stability roomLong running stability studies held at a defined temperature and relative humidity
Cold roomRefrigerated product, reference standards, vaccines, biological samples
Freezer roomProduct and samples held well below zero, with the condensation and structural consequences that brings
Warm roomIncubation and accelerated condition studies
Cytotoxic and controlled drug storageSecured, monitored storage with access control obligations

Why a small room is a serious project

Because the acceptance criteria are absolute and they are measured by somebody else.

A stability room is not accepted because it looks right. It is accepted because a mapping exercise puts sensors through the room, loaded and unloaded, and demonstrates that every point in the usable volume stays inside specification for the duration, including through a door opening and a defrost cycle and a power interruption.

If the mapping fails, the room is not late. The studies inside it may be gone. That is the risk that makes a cheap controlled temperature room the most expensive thing in the building.

The things that make mapping fail

  • Insufficient or badly distributed airflow. The plant is big enough on paper but the air does not reach the corners, and the corners are where the sensors go.
  • Thermal bridging through the structure. A steel member passing through the envelope is a path for heat, and it will show up as a cold or warm spot exactly where you did not want one.
  • Door sequencing and air locks. How long the door is open, how often, and what happens to the room when it is.
  • Defrost cycle excursions. The room holds specification beautifully until the defrost runs, and then it does not.
  • Heat load from the racking, the lighting and the product itself, which was calculated for an empty room and then the room got loaded.
  • No power redundancy, so a routine outage becomes a deviation report.
  • Monitoring system not qualified, so the room is fine but you cannot prove it.

How we hand these over

With the room built to a design that anticipated the mapping, the mechanical services commissioned and documented, the monitoring system installed and ready for qualification, and the construction evidence assembled so your validation team is not chasing us for certificates three weeks after we have left site.

These are small jobs. They are often the first job a new client gives us, and they are frequently urgent, because the room that failed was the room something was living in.