PC2 and PC3 containment laboratory construction

Containment laboratories fail certification for buildable reasons far more often than scientific ones. Sealing, room integrity, airflow direction and the details around penetrations are construction problems, and they are cheapest to solve before the walls go up.

Home › Controlled environments › PC2 and PC3 containment laboratories

Who builds these, and why

Universities, medical research institutes, diagnostics companies, veterinary and agricultural laboratories, and increasingly the commercial biotech companies that graduate out of shared facilities and need their own space.

The work usually arrives in one of four ways. A new research program needs containment space that does not exist. An existing PC2 laboratory has to be uplifted to PC3 because the work has changed. A certification inspection has produced findings that have to be closed out. Or a lease has ended and the whole facility has to be rebuilt somewhere else.

The second of those, the PC2 to PC3 uplift, is the one people underestimate most consistently. We have written a short guide on it: PC2 to PC3: what the uplift actually involves.

What actually changes between PC2 and PC3

PC2 is a well controlled laboratory. PC3 is a sealed box with directional airflow, and that difference is structural, not cosmetic.

  • Room integrity. PC3 requires the room to be sealable for decontamination. Every penetration, every service entry, every junction between wall and ceiling and floor becomes a detail that has to be designed, not improvised on site.
  • Directional airflow. Inward airflow has to be maintained, shown at the entry and alarmed if it drifts. That is a mechanical services design problem with a construction consequence, because the room has to be tight enough for the plant to achieve it.
  • Airlock and entry sequence. PC3 entry is through an airlock whose doors cannot both be open at once, often with a separate change room. The way people and material enter and leave changes, which usually means the floor plan changes, which usually means the egress calculation changes.
  • Surface finishes. Cleanable, impervious, resistant to the decontamination method that will actually be used on them.
  • Services and containment of waste. Drainage, autoclave placement and the path contaminated material takes out of the room.

The single most common and most expensive discovery on an uplift is that the existing room cannot be made tight enough without taking the linings off. That is a question worth answering before the budget is set, not after the contract is signed.

The certification path, and where construction sits in it

Containment facilities working with genetically modified organisms are certified by the Office of the Gene Technology Regulator against published guidelines for each containment level. Facilities working with other biological agents are generally assessed against AS/NZS 2243.3. Many facilities sit under both, and some also carry departmental requirements for imported biological material.

What that means practically is that your facility gets inspected against a written checklist by someone who has seen a lot of laboratories. Construction is not a supporting act in that inspection. Sealing, finishes, airflow and the physical barrier are most of the checklist.

We build backwards from that inspection. The room gets designed so it will pass, and the evidence gets assembled as the work proceeds rather than reconstructed afterwards.

Where these projects go wrong

The problemWhen it should have been caught
Penetrations sealed after the fact, in a way that cannot be decontaminatedServices coordination, during design
Ceiling system cannot achieve the required integrity because of how it is suspendedDesign, when the ceiling system was selected
Airflow cannot be maintained because the room leaksDesign, and again at first fix
Airlock added late, and the new layout breaches exit travel distanceDesign, before the certifier saw it
Finishes rejected because they will not survive the decontamination methodSpecification, before ordering
No room to get the autoclave in once the walls are builtDesign, at equipment schedule

Every one of those is a design stage decision that becomes a construction stage disaster. That is the argument for getting a builder who understands containment into the conversation early, which is what our feasibility and pre-build review exists to do.