A second GMP facility for the same client

The most useful thing we can tell you about our first cleanroom project is that the client came back and asked us to build another one. This is what was different the second time.

Home › Projects › Second GMP facility for the same client
Sector
Regulated manufacturing
Location
Queensland
Relationship
Repeat client
Delivery
Design stage through construction

Why the second one is the interesting one

Anyone can be engaged once. In a regulated manufacturing business, being engaged a second time means the first facility passed the tests that matter: it got approved, it got validated, and it has been operating.

It also means the client had a year or more to discover everything we got wrong, and decided it was outweighed by what we got right. We would rather be judged on that than on a testimonial.

What we did differently

We were in the room earlier

On the first facility we were engaged with a design largely settled. On the second we were part of the design conversation, and the difference showed up in the things that did not happen. Fewer clashes between the ceiling system and the services. Fewer questions from the certifier that needed a consultant and a month. Equipment access resolved on the drawings rather than on site.

This is the whole argument for involving a builder during design. It is not that we design better than the designers. It is that we know what is expensive to build, and we know it before it is drawn.

The approvals path was understood

We already knew what this type of facility required: which approvals ran in which order, which parts of the code the design would not satisfy without a Performance Solution, and which certificates would be needed at the end. The second project did not have to discover any of that.

The trade team was largely the same

The cleanroom panel contractor, the mechanical contractor and the specialist trades had already worked together on a facility of this type, for this client, to this standard. That is worth a great deal on a project where the interfaces between trades are the main risk.

What we would tell a first time client

  • Get the builder in during design. Not at tender. The decisions that set your cost and your program are made before a builder is normally appointed.
  • Find your Performance Solutions early. Classified facility layouts routinely fall outside the deemed to satisfy provisions. That is normal and manageable in design, and a program problem in construction.
  • Ask how the equipment gets in before the design is locked.
  • Agree what handover means at the start. Practical completion and validation ready are not the same thing, and the gap between them is where the arguments happen.
  • Assemble the team early. Designer, builder, certifier, cleanroom contractor and mechanical engineer in the same conversation during design, not sequentially afterwards.

We wrote those lessons up properly in our guide, Top 11 things to do before you build your cleanroom, which you can download from the guides section.

Published without the client's name, site or identifying project detail. Referees and further detail are available directly under a confidentiality undertaking.